The screw pile provides foundations for laterally loaded stand-alone pole lighting and is installed quickly and effectively by a hydraulicrotary drive, positioned for pole attachment within and to the desired depth depending on load and soil conditions. They are generally between 1000mm and 1400mm long.(see screw installation)
Portable concrete block: Very versatile as relocatable and permanent footing. Designed to be moved by a fork lift or hiab, it is well suited for construction sites, road works and site security/ safety lighting. Available in one to three tonnes depending on wind loadings.(see permanent or temporary block)
Engineered and certified for the pick up points and the specific wind loadings.